Close

Drastic times call for Drastic Redesigns

A project log for Amherst Makerspace Maker Station

A system to manage makerspace members access to equipment

marcel-chabotMarcel Chabot 01/17/2024 at 03:170 Comments

This project has gone stagnant, and it is due for some significant updates. Technology has changed, the Makerspace needs have changed, and the system has to change to match. I'm going to create a series of Project Log entries chronicling the process of the redesign. This is all done retrospectively, so I may miss one or more of my numerous stumbling blocks on the way, but I'll do my best to document them all.

Discussions